Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results

Loading...
Thumbnail Image

Date Issued

Date Online

Language

en

Review Status

Access Rights

Open Access Open Access

Share

Citation

Sally, H.; Berthery, D.; Certain, F.; Durbec, A. 1989. Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results. Digana Village, Sri Lanka: International Irrigation Management Institute (IIMI). 26p. (IIMI Working Paper 010)

Permanent link to cite or share this item

External link to download this item

DOI

Abstract/Description

The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described.

Countries