Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results
Loading...
Date Issued
Date Online
Language
en
Type
Review Status
Access Rights
Metadata
Full item pageCitation
Sally, H.; Berthery, D.; Certain, F.; Durbec, A. 1989. Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results. Digana Village, Sri Lanka: International Irrigation Management Institute (IIMI). 26p. (IIMI Working Paper 010)
Permanent link to cite or share this item
External link to download this item
DOI
Abstract/Description
The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described.